Design Needs by Thursday 3/7 at 6pm

Team,

Paco and I reviewed the icons created and here’s a recap of the icons being created for this week’s update:

POINTS OF INTEREST SCREEN (MAIN CAMPUS BUILDING A)
– Learning Center
– Rising Star
– STEM Program

HOME SCREEN
– Redesign campus icon – Downtown (this one replaces Main Campus), Allied Health & Nursing, Bill J. Priest, West Campus — target size to be 95 x 75
– New Parking Icon
– New Emergency Button

BUILDING A
– Redesign All Icons – Building A, Building B, Building C, Building R, Campus Map, Phone Directory, Points of Interest
– New Floor Map Icon

FLOOR MAP
– Create Floor Maps for Building A, Building B, Building C (main floor maps only, not the individual floors)

ElCentroApp_Home_Screen

ElCentroApp_POI_Screen

ElCentroApp_BldgA_Screen

Advertisements

One thought on “Design Needs by Thursday 3/7 at 6pm

  1. I will be resizing the icons and optimizing them at the target size of 95 x 75. Solomon, just keep on building them as you have been and as long as they’re saved as illustrator files I can work with them.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s